Road Closure at Rash Bridge


16th July 2019 Facebook Twitter LinkedIn Google+ News



Please find attached details in relation to an temporary road closure which has been put in place to allow Metcalfe Civil Engineering to carry out bridge repair works.

This notice will come into operation 13th August 2019 and is expected to remain in place for an approx. duration of 6 weeks.

Please see below details of the extents of the closure and diversion route;

Location:  The U5513 Rash Bridge, near Sedbergh from its junction with the U5475 Brackensgill Lane, extending in a north easterly direction for approx. 80m.

Alternative Route:  A suitable alternative route for vehicles will be signed and available via the unrestricted section of the U5513, U5475 Brackensgill Lane and the C5101 Hall Road.

DIVERSION – RASH BRIDGE